How Scrum Values Can Inspire Best Practices for Construction Teams (Part 2)
- annewerkmeister
- May 20
- 2 min read
Commitment, Focus, and Openness on Site

Why Bring Scrum Values to Construction?
In Part 1, we explored how the five Scrum values, Commitment, Focus, Openness, Respect, and Courage, could massively improve site management and collaboration.
Now, let's dig deeper into the first three: Commitment, Focus, and Openness, and show why they aren't just for software teams, they could rebuild how construction teams work together every day.
1. Commitment: Sprint Goals Aren’t Just for Coders
In Scrum, commitment isn’t vague.
It's made tangible through Sprint Goals: a clear, shared objective for every short-term phase of work.
Scrum Teams stay committed through structured ceremonies:
Daily Standups: Realign daily: are we still working toward the sprint goal?
Sprint Reviews: Validate the outcome: did we meet the goal?
Sprint Retrospectives: Adjust the method: how can we better reach goals next time?
In construction, imagine if instead of just "build faster," every week or fortnight had a micro-goal:
"Frame Level 2 by next Friday."
"Complete rough-in inspections across zones B1 and B2."
"Pour slab and start curing by Wednesday."
Commitment wouldn’t be abstract anymore.
It would be revalidated daily, openly, and collectively.
2. Focus: The Natural Consequence of Commitment
If everyone shares the same sprint goal, focus comes naturally.
Without alignment, every subcontractor, supervisor, and manager prioritizes their fire drill first.
With clear goals, prioritization becomes simple:
"Does this task move us toward the sprint goal? If yes, do it. If not, defer it."
Also: Multitasking is a myth.
In construction, trying to do ten tasks at once: punchlisting, inspecting, ordering materials, solving clashes, means doing ten tasks badly.
Scrum’s rhythm enforces that:
Do fewer things.
Do them better.
Finish them before starting new chaos.
On site, embracing Focus would mean:
Clearer task sequencing.
Less start-stop-start chaos.
Higher quality workmanship and faster delivery.
3. Openness: Bringing Error Culture to Construction Sites
Openness isn’t just about being polite. It’s about surfacing problems early instead of hiding them under stress.
Scrum relies on Openness to improve sprints. Construction desperately needs it to prevent small issues from becoming big disasters.
Today, many construction sites operate under a culture of:
Hide mistakes to avoid blame.
Fix quietly to survive today’s deadline.
The result?
Repeat the same errors.
Bigger rework costs.
More frustration.
By shifting to an Error Management culture, accepting that errors will happen but can be caught and corrected early, you turn mistakes into learning, not shame.
Left side (Error Prevention = Zero Tolerance):
Stress, hiding, blame, repetition.
Right side (Error Management = Acceptance of Human Error):
Open communication, fast detection, learning, improved long-term performance.
Which side would you rather build on?
When construction teams commit openly to shared goals, focus their daily work on those goals, and create safe spaces to surface errors, they move faster, better, and smarter.
Commitment ➔ Focus ➔ Openness
This is not just theory.
It’s a practical survival skill for modern projects.
At Romulus Technology, we help construction companies bring clarity, alignment, and human-centered processes to chaotic sites.
Let’s build smarter together.